CLIENT

Town of Woburn, MA

DESIGN ENGINEER

Camp, Dresser, McKee

PROJECT

Water Treatment Facility

DIVISION

Mechanical Construction

  • The 62′ x 87′ addition housed new pressure filtration vessels, UV disinfection modules, backwash pumps, recycle pumps, sludge pumps, chemical feed systems, process piping, and associated plumbing, electrical and HVAC systems. The construction project consisted of concrete foundation, structural steel frame, Concrete Masonry Unit (CMU) walls with brick and precast concrete facade and a synthetic slate roof.