CLIENT
College of the Holy Cross
ENGINEER
Oak Engineers
PROJECT
Steam Line
DIVISION
Utility Construction
- Installed approximately 600 feet of 10-inch steam line and a 4-inch condensate line, placed under drains in trench, and tied into existing drain system