CLIENT
City of Holyoke, MA
DESIGN ENGINEER
Metcalf & Eddy
PROJECT
Wastewater Treatment Facility
DIVISION
Mechanical Construction
- Managed design/build project
- Constructed Combined Sewer Overflow (CSO) facility, piping and equipment, CSO operations building, screenings structure, and chlorine contact tank
- Modified existing CSO structure, outfall tunnel rehab, and primary clarifier rehab
- Built new Waste Actuated Sludge Thickener Facility, mixed sludge well and sludge piping
- Replaced three influent screw pumps with influent submersible pumps while maintaining headworks operation
- Developed odor control system consisting of covers over existing tanks, FRP ductwork, and odor control scrubbers