CLIENT

Rolls-Royce Naval Marine, Inc.

ARCHITECT

TLF, Inc.

PROJECT

Warehouse and Office Building Project

DIVISION

Building Construction

Construct a 24,000 sq. ft. Pre-Engineered Metal Building for warehouse needs. Work took place adjacent to an existing manufacturing operation without interrupting daily operations.

  • Demolish existing parking lot and existing fencing and containment area.
  • Excavate and backfill 24K sq. ft. addition.
  • Excavate, install and backfill, new 8″ fire line and hydrant, 15″ roof drainage system, and new underground electrical duct bank.
  • Excavate and install two infiltration basins for site drainage.
  • Grade and slope site with the use of Trimble GPS guidance.
  • Grade, pave and stripe new parking lot and fire lane.