Provide interior alterations and installed one vacuum furnace with monorail cranes. Construct a 918 sf MTS Chemical Storage Building which connects through process piping to two chemical tanks.
Self-performed concrete pads for multiple tanks outside the facility, and for an HVAC unit, and a generator.
Sitework included excavation, the relocation of a retention pond, paving and landscaping.
Installed emergency tempered water loop and safety showers.
Installed man doors, electrical room, mechanical/HVAC, fire protection and sprinkler system.
Connected underground process piping from MTS building, to the existing building, and the tank farm.
Installed Generator EPO button and Generator Remote Annunciator at a location acceptable to Worcester Fire.