Project Overview:
Design-build of a new industrial wastewater treatment facility at this manufacturing plant. The facility is designed to meet environmental compliance and operational efficiency by treating processed wastewater before discharge to the municipal system.
  • 9,960-square-foot pre-engineered metal building constructed on FRP foundation with slab-on-grade.
  • Complete installation of site utilities, including sanitary piping, force mains, stormwater drainage, water service, natural gas, and an electrical service and distribution duct bank.
  • Self-performed all site work for the treatment plant construction.
  • Integration of advanced treatment components, such as an elevated access platform, rotary screens, FRP process tanks, chemical feed systems, associated pumps, piping, valves, and field instrumentation.
  • Installed all supporting MEP systems to ensure the reliable, continuous operation of the facility.