Comprehensive replacement of critical HVAC infrastructure at National Grid’s North Andover facility, aimed at enhancing system reliability, energy efficiency, and operational safety.
Replaced (2) 200-ton chiller units to improve cooling performance and reduce energy consumption.
Installed new condenser pumps and circuit breakers to ensure safe and efficient operation.
Extended the concrete equipment pad to accommodate the upgraded mechanical systems.
Replaced all existing power wiring from the new equipment to the existing Building Management System (BMS) panel, ensuring seamless integration and control.
Integration of WPR2-100 monitoring devices on chilled water return lines for enhanced diagnostics and system performance tracking.
Reconfiguration of insulated piping, valves, and gauges to support the new equipment and optimize chilled water distribution.