Upgrade an existing wet lab with a new Wafer Processing System (WPS) as well as a new pH Neutralization system.
Efficient Demolition. Remove and dispose of existing wafer processing equipment, lab equipment, and the associated drain and neutralization system.
Engineering and Design. Provide design, engineering and installation of new controls for leak detection alarm systems.
Mechanical Systems Installation. Install a dedicated fire suppression system for the new space and equipment.
Live Business Environment. The live manufacturing environment necessitated stringent safety protocols, robust communication, and close coordination with facility operations.