Removal of existing dissolved air flotation (DAF) thickener, installation of a new enclosed gravity belt thickener (GBT) with associated equipment. Construct interior walls to enclose the GBTs, exterior window replacement with new masonry wall, HVAC, instrumentation, and electrical upgrades within the Operations Building.
- Efficient Demolition and Installation. Safely removed existing DAF thickener and installed new GBT with minimal disruption to operations.
- Seamless System Integration. Installed new GBT with pump, controls, and piping, coordinated across trades for efficient startup.
- Strategic Interior Buildout. Constructed interior walls to enclose both GBTs, maintaining access and meeting safety requirements.
- Exterior Wall Upgrades. Replaced old windows and built new masonry wall with doors and energy-efficient windows.
- Targeted MEP Improvements. Upgraded HVAC, electrical, and instrumentation systems to fully support the new GBT room.