Double Wall Force Main,
Paxton, MA
Client: Anna Maria College
Engineer: Weston and Sampson
Contract Value: $2,550,000

Because portions of this three mile force main transited conservation areas a double wall HDPE line was used and required specialized butt fusing equipment. In addition to the main line, 840 feet of 2” force main, pump stations, grinder pumps and controls were installed.

Building Confidence From the Ground Up