|
Project consisted of construction of a new raw water pump station and filter building with chemical feed systems and included demolition of the existing building, piping and equipment and chemical feeds. The existing building was demolished to 80% leaving a temporary structure over the existing pump station to protect it from the elements and was kept operational until the new filter plant and pump station were ready for start-up.
|